Here is the first pic of my deer skinning rack. It is not totally finished. I have to add the boat winch and pulleys, and oh yeah the deer. I gave it the jump and hang test. It passed.
2" 3/16"square tubing on bottom. 1 1/2" sched. 40 pipe for lower section and 2" sched.40 pipe for the top two pieces. The supports are made of 3/16" plate.
Where to Buy
Service & Support
e-Learning
Weld Talk


Reply With Quote

,then i saw the second picture!nice job,good idea!
