...I just wanted to report tha after breaking the rack on my 16 speed Central Machinery drill press, I decided to call HF and see if parts were available. After a 25 minute wait on the phone, I talked to the rep and he said the rack was 6-8 weeks from China and the collar that secures the rack at the top is available locally.
I bought two racks for 12.00 and one collar for 8.00.
My thought is to shorten the rack which broke to about 24" long and use the second collar to secure the the bottom since I never lower the table to the ground. I bought two racks just in case I need another one.
Honestly, I was very surprised that parts were available.
I bought two racks for 12.00 and one collar for 8.00.
My thought is to shorten the rack which broke to about 24" long and use the second collar to secure the the bottom since I never lower the table to the ground. I bought two racks just in case I need another one.
Honestly, I was very surprised that parts were available.